Plan with the GC
We set the install phases and shift times with the GC and the airline, around the terminal's schedule.
We install what we build. Our crews are SIDA badged (cleared to work in airport secure areas) and led by OSHA 30-trained supervisors, and they’re used to working nights in live terminals. We install the counters, podiums, casework and metal we build in Houston, including night and phased installs in live terminals. We have served 300+ airports across the US.





AWI QCPWhat we install
We install the millwork we build. Our millwork installation services cover:
If your project needs supply only, we can ship the millwork for your own installer.
SIDA-badged crews
Airport work needs installers who pass a background check and hold a badge. Our millwork installers are background-checked and SIDA badged, so they can work in secure areas. Escort ratios and badging rules differ by airport, so we build badging time into the schedule.
Our supervisors are OSHA 30 trained, and we’re OSHA compliant.

Live terminals
Most airport installs happen while flights keep running. We plan night shifts and phased installation with the GC and the airline, so enough counters and gates stay open at each stage. Our crews protect the finished work and the areas around it until handover.
For General ContractorsPlan to close-out
We set the install phases and shift times with the GC and the airline, around the terminal's schedule.
Our installers complete the airport's background checks and badging before the first shift.
Our crews set the millwork, casework and metal, connect the trim and protect the finished work.
We walk the work with the GC, close out the punch list and hand over the area.
Why Volume Millwork
Most installers set work someone else built. Ours set what our shop built, so they know every drawing, and any fix comes straight from our shop.
Related services
We install what our shop builds, so one team answers for the fit from drawings to punch list.




Questions, answered
Yes. Crews we manage and supervise install the counters, podiums, casework and metal we build in Houston. Because the same company builds and installs, the installers know the shop drawings, and fixes come straight from our shop. If you need supply only, we can ship the millwork for your installer.
Yes. Our installers are background-checked and SIDA badged, so they can work in airport secure areas. Badging rules and escort ratios differ by airport, so we build badging time into the schedule. Our supervisors are OSHA 30 trained.
The main cost drivers are the size of the scope, the number of phases, night or off-hours shifts, badging and escort needs, and how far the site is from Houston. Installs in a live terminal take more planning than an empty building. We price the install with the millwork, so you see one number for the whole scope.
Yes. We plan night shifts and phased installs with the GC and the airline, so the terminal stays open and enough counters and gates keep working at each stage. Our crews protect the finished work and the areas around it until handover.
Yes. We build in Houston, ship nationwide and send crews we manage and supervise to install. Typical lead time from approved shop drawings is 6 to 12 weeks, depending on the scope.
Let’s build it