4310 Directors Row, Houston, TX 77092Monday to Friday, 7:00 AM to 3:00 PM CTinfo@vmillwork.com
Call an Estimator(713) 538-1451Request a Bid

Millwork installation by SIDA-badged crews we manage and supervise.

We install what we build. Our crews are SIDA badged (cleared to work in airport secure areas) and led by OSHA 30-trained supervisors, and they’re used to working nights in live terminals. We install the counters, podiums, casework and metal we build in Houston, including night and phased installs in live terminals. We have served 300+ airports across the US.

Volume Millwork installers working from a platform inside an airport terminal
Volume Millwork installer finishing a stainless-clad counter in an airport terminal
Stainless counter with a roll-down shutter set in place in an airport terminal
Volume Millwork crew installing millwork in an airport terminal
Southwest Airlines agents working at new check-in counters at Tampa International Airport
300+ Airports served35+ Years of experienceSIDA Badged installersOSHA 30 Trained supervisorsAWI Quality Certification Program sealAWI QCP

What we install

What do our millwork installation services cover?

We install the millwork we build. Our millwork installation services cover:

If your project needs supply only, we can ship the millwork for your own installer.

SIDA-badged crews

Crews cleared for airport secure areas

Airport work needs installers who pass a background check and hold a badge. Our millwork installers are background-checked and SIDA badged, so they can work in secure areas. Escort ratios and badging rules differ by airport, so we build badging time into the schedule.

Our supervisors are OSHA 30 trained, and we’re OSHA compliant.

Volume Millwork installer finishing a stainless-clad counter in an airport terminal

Live terminals

Night and phased installs while the terminal stays open

Most airport installs happen while flights keep running. We plan night shifts and phased installation with the GC and the airline, so enough counters and gates stay open at each stage. Our crews protect the finished work and the areas around it until handover.

For General Contractors

Plan to close-out

From install plan to punch list

Request a Bid

Plan with the GC

We set the install phases and shift times with the GC and the airline, around the terminal's schedule.

Badge the crew

Our installers complete the airport's background checks and badging before the first shift.

Install

Our crews set the millwork, casework and metal, connect the trim and protect the finished work.

Punch list and close-out

We walk the work with the GC, close out the punch list and hand over the area.

Why Volume Millwork

Installed by the shop that built it

Most installers set work someone else built. Ours set what our shop built, so they know every drawing, and any fix comes straight from our shop.

Related services

What our
crews install

We install what our shop builds, so one team answers for the fit from drawings to punch list.

Questions, answered

Questions about millwork installation

Do you handle millwork installation for the millwork you build?

Yes. Crews we manage and supervise install the counters, podiums, casework and metal we build in Houston. Because the same company builds and installs, the installers know the shop drawings, and fixes come straight from our shop. If you need supply only, we can ship the millwork for your installer.

Are your millwork installers badged for airport secure areas?

Yes. Our installers are background-checked and SIDA badged, so they can work in airport secure areas. Badging rules and escort ratios differ by airport, so we build badging time into the schedule. Our supervisors are OSHA 30 trained.

What affects the cost of millwork installation?

The main cost drivers are the size of the scope, the number of phases, night or off-hours shifts, badging and escort needs, and how far the site is from Houston. Installs in a live terminal take more planning than an empty building. We price the install with the millwork, so you see one number for the whole scope.

Do you do millwork installation at night in an open terminal?

Yes. We plan night shifts and phased installs with the GC and the airline, so the terminal stays open and enough counters and gates keep working at each stage. Our crews protect the finished work and the areas around it until handover.

Do you offer millwork installation outside Texas?

Yes. We build in Houston, ship nationwide and send crews we manage and supervise to install. Typical lead time from approved shop drawings is 6 to 12 weeks, depending on the scope.

Let’s build it

Planning an install
in a live terminal?

Your information

We use the details you enter only to reply to your request. The form opens an email in your own email app, and nothing is sent until you send it.

Read our privacy policy.